Watershed - Presque Isle River (LS16)
Presque Isle River Watershed

Details

This watershed drains to the Upper Peninsula of Michigan and is dominated by numerous lakes and wetlands. There are no WPDES-permitted discharges in this watershed. Crab Lake is classified as an outstanding resource water. We know very little about streams in the Presque Isle River watershed.

Date  1999

Ecological Landscapes for Presque Isle River Watershed

Ecological Landscapes

The Presque Isle River Watershed is primarily located in the North Central Forest Ecological Landscape which occupies much of the northern third of Wisconsin. Its landforms are characterized by end and ground moraines with some pitted outwash and bedrock controlled areas. Kettle depressions and steep ridges are found in the northern portion. Two prominent areas in this Ecological Landscape are the Penokee-Gogebic Iron Range in the north extending into Michigan, and Timm's Hill, the highest point in Wisconsin (1,951 feet) in the south. Soils consist of sandy loam, sand, and silts. The vegetation is mainly forest, with many wetlands and some agriculture, though the growing season is not as favorable as it is in southern Wisconsin. Lake Superior greatly influences the northern portion of the Ecological Landscape especially during the winter season, producing greater snowfall than in most areas in Wisconsin. The historic vegetation was primarily hemlock-hardwood forest dominated by hemlock, sugar maple, and yellow birch. There were some smaller areas of white and red pine forest scattered throughout the Ecological Landscape, and individual white pines trees were a component of the hemlock-hardwood forest. Harvesting hemlock to support the tanneries was common at the turn of the century, and the species soon became a minor component of forests due to over-harvesting and lack of regeneration. Currently, forests cover approximately 80% of this Ecological Landscape. The northern hardwood forest is dominant, made up of sugar maple, basswood, and red maple, and also including some scattered hemlock and white pine pockets within stands. The aspen-birch forest type group is also relatively abundant, followed by spruce-fir. A variety of wetland community types also are present, both forested and non-forested.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
4/15/2018
Waters Involved
Big Lake
Status
Complete

Cisco Chain Riparian Owners Assoc: Big Lake Ais Monitoring And Control Project: Cisco Chain Riparian Owners Association is sponsoring an ACEI grant to fund a project which will focus on surveying, monitoring, mapping, and hand-pulling EWM in Big Lake (Cisco Chain), Vilas County.

Project activities include: 1) Conduct annual early-season and mid-late season AIS surveys;2) Control EWM by professional hand-removal and DASH efforts; 3) Develop annual maps and report; 4) Develop end of project report.

Project deliverables include: 1) EWM survey data and maps; 2) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual reports and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all aquatic plant and any GIS data.


Grant Details
Aquatic Invasives Control
Date
4/15/2020
Waters Involved
Forest Lake
Status
Complete

Forest Lake Preservation Foundation, Inc.: 2020-22 Forest Lake Dash Harvesting: The Forest Lake Preservation Foundation Inc is sponsoring a grant on Forest Lake to be completed by June 30, 2023. The project will focus on management of Eurasian water milfoil (EWM).

Project activities include:
1. Integrated pest management for EWM using 2,4-D on Forest Lake
2. Integrate pest management for EWM using diver assisted suction harvesting (DASH)
3. Herbicide concentration monitoring
4. Point intercept subset survey in 2021 and full survey in 2022
5. Clean boats clean waters (CBCW) efforts

Project deliverables include:
1. Water quality results and CBCW entered into SWIMS
2. Annual AIS monitoring and control strategy reports
3. Point Intercept and EWM Mapping Surveys
4. Herbicide concentration results
5. Final report summarizing AIS mgmt. and future AIS mgmt. and monitoring suggestions


Specific project conditions:


If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Big Lake
Status
Complete

Cisco Chain Riparian Owners Assoc: Big Lake Ewm Early Response Project: Cisco Chain Riparian Owners Association, Inc. is sponsoring an Early Detection Response project focusing on surveying, monitoring, mapping, hand-pulling, and chemically treating the new discovery of EWM in Big Lake of the Cisco Chain, Vilas County.

Project activities include: 1) Conduct annual pre/post treatment surveys; 2) Control EWM by hand removal efforts and chemical treatments; 3) Develop annual maps and summary report.

Project deliverables include: 1) EWM survey data and maps; 2)Annual summary report describing the findings of the pre/post treatment surveys, chemical treatments, hand-pulling efforts, guidance for continued control actions.

Specific conditions for this project: Annual summary report needs Department review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of summary reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
9/1/2008
Waters Involved
Harris Creek
Status
Complete

Harris Lake Association, Inc.: Harris Lake Curly-Leaf Pondweed Rapid Response Project: Harris Lake Association, Inc is sponsoring an Rapid Response grant to be completed by June 30, 2011. The project will focus on surveying and mapping CLP for 2 years to determine how much CLP exists and assess annual differences in the CLP population in Harris Lake. Management alternatives, if necessary, will be explored once the surveying and mapping is completed and will be part of this project.

Project activities include: 1) Surveying and mapping of CLP (early June) during 2009 and 2010; 2) Pre-treatment survey conducted a week or less prior to any management; 3) Any necessary management; 4) Post-treatment survey the following spring after management.

Project deliverables include: 1) Final report describing the findings of the surveying, mapping, pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
9/1/2008
Waters Involved
Harris Lake
Status
Complete

Harris Lake Association, Inc.: Harris Lake Curly-Leaf Pondweed Rapid Response Project: Harris Lake Association, Inc is sponsoring an Rapid Response grant to be completed by June 30, 2011. The project will focus on surveying and mapping CLP for 2 years to determine how much CLP exists and assess annual differences in the CLP population in Harris Lake. Management alternatives, if necessary, will be explored once the surveying and mapping is completed and will be part of this project.

Project activities include: 1) Surveying and mapping of CLP (early June) during 2009 and 2010; 2) Pre-treatment survey conducted a week or less prior to any management; 3) Any necessary management; 4) Post-treatment survey the following spring after management.

Project deliverables include: 1) Final report describing the findings of the surveying, mapping, pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2011
Waters Involved
Harris Lake
Status
Complete

Harris Lake Association, Inc.: Harris Lake Clp Control Project - Phase Ii: Harris Lake Association is sponsoring an AIRR project which will focus on surveying and mapping CLP and managing up to 11 acres of CLP in Harris Lake, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and hand removal efforts; 3) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
9/1/2008
Waters Involved
Unnamed
Status
Complete

Harris Lake Association, Inc.: Harris Lake Curly-Leaf Pondweed Rapid Response Project: Harris Lake Association, Inc is sponsoring an Rapid Response grant to be completed by June 30, 2011. The project will focus on surveying and mapping CLP for 2 years to determine how much CLP exists and assess annual differences in the CLP population in Harris Lake. Management alternatives, if necessary, will be explored once the surveying and mapping is completed and will be part of this project.

Project activities include: 1) Surveying and mapping of CLP (early June) during 2009 and 2010; 2) Pre-treatment survey conducted a week or less prior to any management; 3) Any necessary management; 4) Post-treatment survey the following spring after management.

Project deliverables include: 1) Final report describing the findings of the surveying, mapping, pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/31/2018
Waters Involved
West Bay Lake
Status
Complete

Cisco Chain Riparian Owners Assoc: West Bay Lake Ais Monitoring & Control Project: Cisco Chain Riparian Owners Association is sponsoring an Early Detection and Response project which will focus on surveying, monitoring, mapping, and hand-pulling EWM in West Bay Lake, Vilas County.

Project activities include: 1) Conduct annual early-season, mid-late season and post management evaluation AIS surveys; 2) Conduct PI survey; 3) Control EWM by volunteer hand-removal, professional hand-removal and DASH efforts; 4) Develop annual maps and report; 5) Develop end of project report.

Project deliverables include: 1) EWM survey data and maps; 2) PI data and vouchers; 3) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual reports and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, vouchers, all maps, and all aquatic plant and any GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Aimer Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aimer Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ambleside Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ambleside Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Annabelle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Annabelle Lake
Status
Complete

Town Of Presque Isle: Presque Isle Town Lakes Committee Apm Plans: The Town of Presque Isle is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on creating APM Plans for Annabelle, Armour, Cathaline, Horsehead, Lynx, Mabel, Papoose, and Van Vliet Lakes and AIS education and prevention.

Project activities include: 1) Point-intercept surveys; 2) Recruit volunteers and implement a CB/CW program; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Water quality sampling; 6) Stakeholder participation: Initial/final meetings, public survey; 7) Develop project report.

Project deliverables include: 1) Point-intercept survey data; 2) Completed entry of inspection Forms 3200-120 onto Dept website; 3) AIS educational and prevention activities; 4) Final report summarizing CB/CW activities, AIS educational activities, and APM Plan.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Annabelle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Annabelle Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Annabelle, Anne, Red Bass, & Vanvliet Lks: The Town of Presque Isle is sponsoring an AEPP grant to study Annabelle, Anne, Red Bass, and VanVliet Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Anne Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Anne Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Anne Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Anne Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Annabelle, Anne, Red Bass, & Vanvliet Lks: The Town of Presque Isle is sponsoring an AEPP grant to study Annabelle, Anne, Red Bass, and VanVliet Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Armour Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Armour Lake
Status
Complete

Town Of Presque Isle: Presque Isle Town Lakes Committee Apm Plans: The Town of Presque Isle is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on creating APM Plans for Annabelle, Armour, Cathaline, Horsehead, Lynx, Mabel, Papoose, and Van Vliet Lakes and AIS education and prevention.

Project activities include: 1) Point-intercept surveys; 2) Recruit volunteers and implement a CB/CW program; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Water quality sampling; 6) Stakeholder participation: Initial/final meetings, public survey; 7) Develop project report.

Project deliverables include: 1) Point-intercept survey data; 2) Completed entry of inspection Forms 3200-120 onto Dept website; 3) AIS educational and prevention activities; 4) Final report summarizing CB/CW activities, AIS educational activities, and APM Plan.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Armour Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Armour Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Armour, Big, And Horsehead Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Armour, Big, and Horsehead Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aurora Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aurora Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Averill Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Averill Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Averill Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Averill, Presque Isle, & Wildcat Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Averill, Presque Isle, and Wildcat Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bambi Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bambi Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Basin Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Basin Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Battine Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Battine Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beatrice Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beaver Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Beaver Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beaver Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Beaver Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Belle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Belle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bena Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Hurst Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Hurst Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Kitten Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Kitten Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Big Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Armour, Big, And Horsehead Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Armour, Big, and Horsehead Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Muskellunge Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Birch Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Birch Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Blue Gill Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Blue Gill Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Blueberry Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bobs Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Boot Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Boot Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Borden Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Borden Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Brown Beaver Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Brown Beaver Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Buck Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Buck Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bug Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bug Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Five Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Ten Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Twelve Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Canteen Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Canteen Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Carlin Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Carlin Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cathaline Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Cathaline Lake
Status
Complete

Town Of Presque Isle: Presque Isle Town Lakes Committee Apm Plans: The Town of Presque Isle is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on creating APM Plans for Annabelle, Armour, Cathaline, Horsehead, Lynx, Mabel, Papoose, and Van Vliet Lakes and AIS education and prevention.

Project activities include: 1) Point-intercept surveys; 2) Recruit volunteers and implement a CB/CW program; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Water quality sampling; 6) Stakeholder participation: Initial/final meetings, public survey; 7) Develop project report.

Project deliverables include: 1) Point-intercept survey data; 2) Completed entry of inspection Forms 3200-120 onto Dept website; 3) AIS educational and prevention activities; 4) Final report summarizing CB/CW activities, AIS educational activities, and APM Plan.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Cathaline Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Constance Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crab Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crab Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Crab Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Armour, Big, And Horsehead Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Armour, Big, and Horsehead Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Crab Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Crab, Little Crab, And North Crab Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Crab, Little Crab, and North Crab Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans


Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Crab Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Crab, Little Crab, And North Crab Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Crab, Little Crab, and North Crab Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans


Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crawford Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crawford Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crystal Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cyrus Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Cyrus Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dads Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Decker Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deer Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deer Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Doe Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Doe Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dorothy Dunn Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Drager Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Drott Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dumbell Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dunn Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dunn Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
East Branch Presque Isle River
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
East Branch Presque Isle River
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
East Branch Presque Isle River
Status
Complete

Town Of Presque Isle: Wilderness Waters: Mccullough, Morton, Dunn & Beaver Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study McCullough, Morton, Dunn, and Beaver Lakes, in Vilas County. The project will focus on developing Lake Management Plans (LMP\2019s).

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Water quality assessment; 5) Professional and volunteer AIS monitoring; 6) Educational program \2013 meetings and \201Cfloating\201D workshop; 7) Watercraft inspections; 8) Develop LMP\2019s.

Project deliverables include: 1) PI, AIS water quality, and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP\2019s.

Specific conditions for this project: LMP\2019s need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Edith Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Edith Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Eloise Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Escanaba Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Etna Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Findler Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flora Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Flora Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Forest Lake
Status
Complete

Town Of Land O Lakes: Forest Lake Comprehensive Lake Management Planning Project: The Town of Land O\2019 Lakes is sponsoring an AEPP grant to study Forest Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Forest Lake and AIS monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries, Shoreline, and Coarse Woody Habitat assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, acoustic survey, early-season AIS survey, EWM peak-biomass, community mapping, and substrate mapping); 7) Volunteer AIS training and monitoring; 8) Data analysis and LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, acoustic, shoreland and woody habitat data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs Dept review and approval; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI survey, acoustic survey, early-season AIS survey, EWM peak-biomass survey, shoreland assessment, woody habitat assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Forest Lake
Status
Complete

Forest Lake Preservation Foundation, Inc.: Forest Lake Management Plan Update: This project will update the 2019 comprehensive plan for Forest Lake. It will analyze historical and current ecological data to identify threats, determine goals and values of stakeholders, and present feasible management actions. This is especially important as the FLPF continues to use integrated pest management (IPM) to manage the lake's Eurasian watermilfoil (EWM) population.


Project final deliverables include:
1) Stakeholder survey
2) Water chemistry data;
3) Watershed maps and modeling data;
4) PI, Early Season AIS, and Late Season EWM data;
7) lake management plan update.


Specific project activities include:
1) Conduct water quality monitoring utilizing WIDNR protocols
2) Updating the general description of the watershed with the most current landcover information available.
3) An early-season AIS (ESAIS) survey, a point-intercept (PI) survey, and a Late-Season EWM Mapping survey.
4) WIDNR approved Stakeholder survey
5) Planning meeting with FLA Board of Directors
6) Data analysis and update to lake management plan.

Special Conditions: 1) WDNR Lake Biologist will be provided with an electronic copy of reports; data from water quality, aquatic plant, and AIS monitoring and surveys; all maps and GIS data from project.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Fox Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Frank Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Geneveive Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
George Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Grant Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gretchen Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Harris Creek
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Harris Creek
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Aquatic Plant Studies - Phase 1 - Harris: Town of Winchester Aquatic Plant Studies - Phase 1 \2013 Harris Lake Promote stakeholder involvement, inform stakeholders on various lake issues, as well as the quality of life on Harris Lake. Control Existing Aquatic Invasive Species and Prevent New Introductions to Harris Lake. Continue curly-leaf pondweed monitoring and hand-removal strategy to manage curly-leaf pondweed population in Harris Lake.


Project final deliverables include:
(1) A written report that includes all educational activities, including dates, times, and number of participants. We will provide copies of social media postings, press releases, and links to potential TV interviews. All CBCW data will be entered into SWIMS.
(2) PL biocontrol and monitoring data will be entered into SWIMS and any new detection of SWF will be sent for vouchering by the sponsor.


Specific project activities include:
(1) Three types of surveys would be performed: a point-intercept (PI) survey, an aquatic plant community mapping survey, and an early season AIS (ESAIS) survey.
(2) NLDC participates in the PL beetle biocontrol program coordinated by DNR.
(3) NLDC educational initiatives.

Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Harris Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Harris Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Aquatic Plant Studies - Phase 1 - Harris: Town of Winchester Aquatic Plant Studies - Phase 1 \2013 Harris Lake Promote stakeholder involvement, inform stakeholders on various lake issues, as well as the quality of life on Harris Lake. Control Existing Aquatic Invasive Species and Prevent New Introductions to Harris Lake. Continue curly-leaf pondweed monitoring and hand-removal strategy to manage curly-leaf pondweed population in Harris Lake.


Project final deliverables include:
(1) A written report that includes all educational activities, including dates, times, and number of participants. We will provide copies of social media postings, press releases, and links to potential TV interviews. All CBCW data will be entered into SWIMS.
(2) PL biocontrol and monitoring data will be entered into SWIMS and any new detection of SWF will be sent for vouchering by the sponsor.


Specific project activities include:
(1) Three types of surveys would be performed: a point-intercept (PI) survey, an aquatic plant community mapping survey, and an early season AIS (ESAIS) survey.
(2) NLDC participates in the PL beetle biocontrol program coordinated by DNR.
(3) NLDC educational initiatives.

Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Lake Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harvey Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harvey Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Heart Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Heart Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hells Kitchen Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hells Kitchen Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Helmet Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Helmet Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hennig Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hiawatha Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Hiawatha Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
High Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
High Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hobo Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Horsehead Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Horsehead Lake
Status
Complete

Town Of Presque Isle: Presque Isle Town Lakes Committee Apm Plans: The Town of Presque Isle is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on creating APM Plans for Annabelle, Armour, Cathaline, Horsehead, Lynx, Mabel, Papoose, and Van Vliet Lakes and AIS education and prevention.

Project activities include: 1) Point-intercept surveys; 2) Recruit volunteers and implement a CB/CW program; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Water quality sampling; 6) Stakeholder participation: Initial/final meetings, public survey; 7) Develop project report.

Project deliverables include: 1) Point-intercept survey data; 2) Completed entry of inspection Forms 3200-120 onto Dept website; 3) AIS educational and prevention activities; 4) Final report summarizing CB/CW activities, AIS educational activities, and APM Plan.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Horsehead Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Horsehead Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Armour, Big, And Horsehead Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Armour, Big, and Horsehead Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Horseshoe Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Indian Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Irving Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jamie Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jamie Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jean Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jenny Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jenny Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jingwak Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jingwak Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
John Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
John Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Junction Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Junction Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Junction Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Annabelle, Anne, Red Bass, & Vanvliet Lks: The Town of Presque Isle is sponsoring an AEPP grant to study Annabelle, Anne, Red Bass, and VanVliet Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Katinka Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Katinka Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Keego Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Keego Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Knife Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Knife Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Adelaide
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Alva
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Franchian
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Helen
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Laura
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Rose
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Salsich
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Yolanda
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Langley Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lewis Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Birch Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Little Crab Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Crab, Little Crab, And North Crab Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Crab, Little Crab, and North Crab Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans


Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Horsehead Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Horsehead Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Hurst Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Hurst Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Papoose Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Presque Isle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Presque Isle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Little Presque Isle Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Twin Island & Little Presque Isle Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Twin Island and Little Presque Isle Lakes, in Vilas County. The project will focus on developing Lake Management Plans (LMP).

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Water quality assessment; 5) Professional and volunteer AIS monitoring; 6) Educational program \2013 meetings and \201Cfloating\201D workshop; 7) Watercraft inspections; 8) Develop LMP.

Project deliverables include: 1) PI, AIS, water quality, and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Star Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lone Pine Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lone Pine Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lone Pine Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lone Pine Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lone Tree Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Aimer Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lower Aimer Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lynx Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lynx Creek
Status
Complete

Town Of Presque Isle: Presque Isle Town Lakes Committee Apm Plans: The Town of Presque Isle is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on creating APM Plans for Annabelle, Armour, Cathaline, Horsehead, Lynx, Mabel, Papoose, and Van Vliet Lakes and AIS education and prevention.

Project activities include: 1) Point-intercept surveys; 2) Recruit volunteers and implement a CB/CW program; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Water quality sampling; 6) Stakeholder participation: Initial/final meetings, public survey; 7) Develop project report.

Project deliverables include: 1) Point-intercept survey data; 2) Completed entry of inspection Forms 3200-120 onto Dept website; 3) AIS educational and prevention activities; 4) Final report summarizing CB/CW activities, AIS educational activities, and APM Plan.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lynx Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lynx Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lynx Lake
Status
Complete

Town Of Presque Isle: Presque Isle Town Lakes Committee Apm Plans: The Town of Presque Isle is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on creating APM Plans for Annabelle, Armour, Cathaline, Horsehead, Lynx, Mabel, Papoose, and Van Vliet Lakes and AIS education and prevention.

Project activities include: 1) Point-intercept surveys; 2) Recruit volunteers and implement a CB/CW program; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Water quality sampling; 6) Stakeholder participation: Initial/final meetings, public survey; 7) Develop project report.

Project deliverables include: 1) Point-intercept survey data; 2) Completed entry of inspection Forms 3200-120 onto Dept website; 3) AIS educational and prevention activities; 4) Final report summarizing CB/CW activities, AIS educational activities, and APM Plan.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lynx Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mabel Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mabel Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Marion Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mary Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
McCullough Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
McCullough Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
McGinnis Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mermaid Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mermaid Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Minonk Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Minonk Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Monahan Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moraine Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Moraine Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moraine Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Moraine Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Morton Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Morton Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Morton Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Mccullough, Morton, Dunn & Beaver Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study McCullough, Morton, Dunn, and Beaver Lakes, in Vilas County. The project will focus on developing Lake Management Plans (LMP\2019s).

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Water quality assessment; 5) Professional and volunteer AIS monitoring; 6) Educational program \2013 meetings and \201Cfloating\201D workshop; 7) Watercraft inspections; 8) Develop LMP\2019s.

Project deliverables include: 1) PI, AIS water quality, and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP\2019s.

Specific conditions for this project: LMP\2019s need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mud Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Murphy Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Murphy Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mystery Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nebish Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Nell Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nineweb Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nixon Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nixon Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
No Mans Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
No Mans Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
North Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
North Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
North Crab Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Crab, Little Crab, And North Crab Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Crab, Little Crab, and North Crab Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans


Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
North Turtle Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Noseeum Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Oriole Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Oxbow Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Oxbow Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pallette Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Papoose Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pardee Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pardee Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Partridge Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Partridge Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pine Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pine Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Plum Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Plum Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Plum Lake
Status
Complete

Town Of Plum Lake: Lake Monitoring On Waters Within The Town Of Plum Lake: The Town of Plum Lake is sponsoring a grant to study 8 Town of Plum Lake Lakes, in Vilas County.

Project activities include: 1) Early detection AIS monitoring (twice on each lake); 2) Point-intercept (PI) surveys on 5 lakes; 3) Hire project staff; 4) AIS and PI survey training for hired project staff; 5) Data entry and analysis; 6) Develop final report.

Project deliverables include: 1) Hired staff; 2) PI and AIS data and maps; 3) Aquatic plant vouchers; 4) Final report.

Specific conditions for this project: Draft of final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, data from PI and AIS surveys, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pond Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pond Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Presque Isle: Presque Isle Wilderness Waters Program: The Town of Presque Isle is sponsoring a project to study 14 lakes in the Town focusing on developing a Lake Management Plan (LMP) for each of the project lakes and a town-wide management plan.

Project activities include: 1) Gather and review existing lake data for study lakes; 2) Public I&E \2013 AIS identification and monitoring training, project meetings, lake-user survey, news release(s), and hand-outs; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, and calcium); 4) Point-intercept (PI) aquatic plant survey and analysis; 5)Watershed assessment; 6) CB/CW, volunteer AIS monitoring, development of lake ordinances, and AIS education programs (children\2019s story hour, fishing tournaments and country fair); 7) Prepare a catalogue of Presque Isle water-related environmental, cultural, and aesthetic attributes; 8) Develop individual LMP\2019s and Town LMP.

Deliverables include: 1) Lake-user survey, news release(s), and hand-outs; 2) PI and water chemistry data; 3) Watershed maps and 2 sets of aquatic plant vouchers per lake; 4) AIS volunteer hours (542) and 200 hours per year of CB/CW hours at AIS landings; 5) Catalogue; 6) Individual LMP\2019s and Town LMP.

Specific project conditions: 1) Draft of lake-user survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) LMP\2019s need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP\2019s, news release(s), hand-outs, lake-user survey, catalogue, data from watershed assessment, PI survey, and water quality sampling, all project maps, all GIS data.


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Averill, Presque Isle, & Wildcat Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Averill, Presque Isle, and Wildcat Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Presque Springs
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Presque Springs
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rainbow Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rainbow Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rainbow Spring
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Razorback Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Red Bass Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Red Bass Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Red Bass Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Annabelle, Anne, Red Bass, & Vanvliet Lks: The Town of Presque Isle is sponsoring an AEPP grant to study Annabelle, Anne, Red Bass, and VanVliet Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Red Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Red Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rice Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rice Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Rice Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Armour, Big, And Horsehead Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Armour, Big, and Horsehead Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rice Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rice Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rock Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rock Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rosalind Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rosalind Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Round Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Round Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rudolph Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rudolph Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Russet Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Russet Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sanborn Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Sanborn Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sanford Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Sanford Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sanford Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Sanford Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Siphon Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Snyder Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
South Branch Presque Isle River
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
South Branch Presque Isle River
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
South Branch Presque Isle River
Status
Complete

Town Of Presque Isle: Wilderness Waters: Averill, Presque Isle, & Wildcat Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Averill, Presque Isle, and Wildcat Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
South Turtle Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Spread Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Spread Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Spruce Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Star Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Star Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Starrett Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Stateline Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stateline Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Stateline Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Stateline Lake: The Town of Presque Isle is sponsoring an AEPP grant to study Stateline Lake, in Vilas County. The project will focus on developing Lake Management Plans (LMP).

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Water quality assessment; 5) Professional and volunteer AIS monitoring; 6) Educational program \2013 meetings and \201Cfloating\201D workshop; 7) Watercraft inspections; 8) Develop LMP.

Project deliverables include: 1) PI, AIS water quality, and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stella Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stevenson Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stevenson Creek Flowage
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stewart Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tamarack Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tambier Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Toy Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Toy Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Trostel Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Turtle River
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Twin Island Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Twin Island Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Twin Island Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Twin Island & Little Presque Isle Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Twin Island and Little Presque Isle Lakes, in Vilas County. The project will focus on developing Lake Management Plans (LMP).

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Water quality assessment; 5) Professional and volunteer AIS monitoring; 6) Educational program \2013 meetings and \201Cfloating\201D workshop; 7) Watercraft inspections; 8) Develop LMP.

Project deliverables include: 1) PI, AIS, water quality, and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Un Spring
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Un Spring
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Unnamed
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Unnamed
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Unnamed
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Unnamed
Status
Complete

Town Of Presque Isle: Wilderness Waters: Twin Island & Little Presque Isle Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Twin Island and Little Presque Isle Lakes, in Vilas County. The project will focus on developing Lake Management Plans (LMP).

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Water quality assessment; 5) Professional and volunteer AIS monitoring; 6) Educational program \2013 meetings and \201Cfloating\201D workshop; 7) Watercraft inspections; 8) Develop LMP.

Project deliverables include: 1) PI, AIS, water quality, and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Unnamed
Status
Complete

Town Of Presque Isle: Wilderness Waters: Crab, Little Crab, And North Crab Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Crab, Little Crab, and North Crab Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans


Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Unnamed
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Aquatic Plant Studies - Phase 1 - Harris: Town of Winchester Aquatic Plant Studies - Phase 1 \2013 Harris Lake Promote stakeholder involvement, inform stakeholders on various lake issues, as well as the quality of life on Harris Lake. Control Existing Aquatic Invasive Species and Prevent New Introductions to Harris Lake. Continue curly-leaf pondweed monitoring and hand-removal strategy to manage curly-leaf pondweed population in Harris Lake.


Project final deliverables include:
(1) A written report that includes all educational activities, including dates, times, and number of participants. We will provide copies of social media postings, press releases, and links to potential TV interviews. All CBCW data will be entered into SWIMS.
(2) PL biocontrol and monitoring data will be entered into SWIMS and any new detection of SWF will be sent for vouchering by the sponsor.


Specific project activities include:
(1) Three types of surveys would be performed: a point-intercept (PI) survey, an aquatic plant community mapping survey, and an early season AIS (ESAIS) survey.
(2) NLDC participates in the PL beetle biocontrol program coordinated by DNR.
(3) NLDC educational initiatives.

Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Aimer Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Upper Aimer Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Van Vliet Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Van Vliet Lake
Status
Complete

Town Of Presque Isle: Presque Isle Town Lakes Committee Apm Plans: The Town of Presque Isle is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on creating APM Plans for Annabelle, Armour, Cathaline, Horsehead, Lynx, Mabel, Papoose, and Van Vliet Lakes and AIS education and prevention.

Project activities include: 1) Point-intercept surveys; 2) Recruit volunteers and implement a CB/CW program; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Water quality sampling; 6) Stakeholder participation: Initial/final meetings, public survey; 7) Develop project report.

Project deliverables include: 1) Point-intercept survey data; 2) Completed entry of inspection Forms 3200-120 onto Dept website; 3) AIS educational and prevention activities; 4) Final report summarizing CB/CW activities, AIS educational activities, and APM Plan.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Van Vliet Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Van Vliet Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Annabelle, Anne, Red Bass, & Vanvliet Lks: The Town of Presque Isle is sponsoring an AEPP grant to study Annabelle, Anne, Red Bass, and VanVliet Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
West Plum Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wharton Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
White Birch Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
White Birch Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wildcat Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wildcat Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Wildcat Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Averill, Presque Isle, & Wildcat Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Averill, Presque Isle, and Wildcat Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wildcat Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wildcat Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Wildcat Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Averill, Presque Isle, & Wildcat Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Averill, Presque Isle, and Wildcat Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wilson Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Winifred Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Winifred Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Big Lake
Status
Complete

Cisco Chain Riparian Owners Assoc: Cisco Chain Riparian Owners Association 2016 Clean Boats Clean Waters: The Cisco Chain Riparian Owners Association (CCROA) is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Cisco Chain of Lakes


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Big Lake
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2017 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Big Lake
Status
Complete

Cisco Chain Riparian Owners Assoc: Cisco Chain Riparian Owners Assoc 2017 Cbcw: Cisco Chain Riparian Owners Assoc is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Big Lake
Status
Complete

Cisco Chain Riparian Owners Assoc: Cisco Chain Riparian Owners Assoc 2018 Cbcw: Cisco Chain Riparian Owners Assoc is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Big Lake
Status
Complete

Cisco Chain Riparian Owners Assoc: Cisco Chain Riparian Owners Assoc 2019 Cbcw: Cisco Chain Riparian Owners Assoc is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE (PALMER BAY).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Big Lake
Status
Complete

Cisco Chain Riparian Owners Assoc: Cisco Chain Riparian Owners Assoc 2020 Cbcw: Cisco Chain Riparian Owners Assoc is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE (PALMER BAY, N/A).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Crab Creek
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Clean Boats Clean Waters 2013: The Crab Lake Conservation Foundation will sponsor a Clean Boats Clean Waters boat landing inspection program at one public boat landing on Crab Lake.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Crab Creek
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Clean Boats Clean Waters Project 2014: Crab Lake Conservation Foundation, Inc. will sponser a Clean Boats Clean Water landing inspection program at 1 public landing in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Crab Creek
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Clean Boats Clean Waters Project 2015: Crab Lake Conservation Foundation, Inc. will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Crab Creek
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Conservation Foundation, Inc. 2016 Clean Boats Clean Waters: The Crab Lake Conservation Foundation, Inc. is sponsoring a 2016 Clean Boats Clean Waters project at one public landing on Crab Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Crab Creek
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Conservation Fdn 2017 Cbcw: Crab Lake Conservation Fdn is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on CRAB LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Crab Creek
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Conservation Fdn 2018 Cbcw: Crab Lake Conservation Fdn is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on CRAB LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Crab Creek
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Conservation Fdn 2019 Cbcw: Crab Lake Conservation Fdn is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on CRAB LAKE (PUBLIC LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Crab Creek
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Conservation Foundation 2020 Cbcw: Crab Lake Conservation Fdn is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on CRAB LAKE (PUBLIC LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Crab Lake
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Clean Boats Clean Waters 2013: The Crab Lake Conservation Foundation will sponsor a Clean Boats Clean Waters boat landing inspection program at one public boat landing on Crab Lake.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Crab Lake
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Clean Boats Clean Waters Project 2014: Crab Lake Conservation Foundation, Inc. will sponser a Clean Boats Clean Water landing inspection program at 1 public landing in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Crab Lake
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Clean Boats Clean Waters Project 2015: Crab Lake Conservation Foundation, Inc. will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Crab Lake
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Conservation Foundation, Inc. 2016 Clean Boats Clean Waters: The Crab Lake Conservation Foundation, Inc. is sponsoring a 2016 Clean Boats Clean Waters project at one public landing on Crab Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Crab Lake
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Conservation Fdn 2017 Cbcw: Crab Lake Conservation Fdn is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on CRAB LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Crab Lake
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Conservation Fdn 2018 Cbcw: Crab Lake Conservation Fdn is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on CRAB LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Crab Lake
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Conservation Fdn 2019 Cbcw: Crab Lake Conservation Fdn is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on CRAB LAKE (PUBLIC LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Crab Lake
Status
Complete

Crab Lake Conservation Fdn: Crab Lake Conservation Foundation 2020 Cbcw: Crab Lake Conservation Fdn is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on CRAB LAKE (PUBLIC LANDING, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Forest Lake
Status
Complete

Forest Lake Preservation Foundation, Inc.: Forest Lake Preservation Foundation, Inc. 2020 Cbcw: Forest Lake Preservation Foundation, Inc. is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on FOREST LAKE (FOREST LAKE LANDIN).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Presque Isle Lake
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2017 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Rice Creek
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2017 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
South Branch Presque Isle River
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2017 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Van Vliet Lake
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2017 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Alder Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Benson Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Bolin Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Chub Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Clear Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Dead Pike Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Deerfoot Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Dog Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Fawn Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Gem Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Homestead Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Island Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.

Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.

Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.

Specific conditions for this project: Annual summary and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Little Saint Germain Lake
Status
Complete

Little St Germain Lake P & R District: Res- L. St. Germain Lake Aeration & Phosphorus Removal Engineering: The Little St. Germain Lake Protection and Rehabilitation District is sponsoring a project involving the installation of two lake aerators for improvement of the winter lake dissolved oxygen levels, development of a preliminary engineering work scope for reduction of phosphorus loading to Little St. Germain Lake, and monitoring of inlake water chemistry, Muskellunge Creek monitoring, and groungwater monitoring to be conducted by the USGS.

Project deliverables for this grant project will be:
USGS report including data from the continued trend monitoring, phosphorus loading data from Muskellunge Creek, sources of phosphorus to Muskellunge Creek, groundwater phosphorus contribution, pre and post aeration system installation oxygen monitoring, an updated lake water and phosphorus budget, and an evaluation of the effectiveness of the aeration system.

A final report from Foth &Van Dyke will include a feasibility study for reduction of the phosphorus loading to Little St. Germain, preliminary engineering of chemical phosphorus removal and cost projections.

Specific conditions for this project include:
* The installation of all stream gauging stations and lake aeration equipment must receive the approval and/or permit from the Department of Natural Resources water regulation section.

The Department of Natural Resources will be provided with electronic and paper copies of the final report of this project.


Grant Details
Lake Protection Grant
Date
10/1/2009
Waters Involved
Little Saint Germain Lake
Status
Complete

Little St Germain Lake P & R District: Res-Restoring Shoreline Habitat On Lt. Saint Germain Lake: Little St. Germain Lake P&R District is sponsoring a project focused on restoring 500 meters of shoreline on Lt. St. Germain Lake. Partners include the USGS, VCLA, Vilas Co. LWCD, UW Ext., WDATCP, MI Tech Univ., & WDNR.

Activities include: 1) native vegetation restoration of 500 meters of shoreline & > 4000 sq. meters of lakeshore buffer; 2) terrestrial & aquatic invasives survey & treatment/removal on restored area; 3) evaluate ecological benefits of buffer restoration for wildlife & fish pops.; 4) assess feasibility of using project to conduct experiments to quantify benifits of buffer re-establishment to reduce nutrient runoff; 5) conduct experiments to develop BMP's for shoreland restoration in the Upper Wisc. River Watershed & Northern Highlands Ecological Landscape; 6) removal, replacement of retaining walls, impervious surfaces within buffer; installation of BMPs for runoff control; 7) repair shoreland erosion w/ biologically degradable materials; 8) tree drops & aquatic macrophyte bed establishment; 9) demo. & education activities including lake ecology workshops, meetings, pamphlets & newsletters; 10) implement pollinator response surveys; 11) final report summarizing project activities including restortaion before & after photos.

Deliverables: 1) 500 meters of restoration & >4000 sq. meters of buffer area; 2) invasives control; 3) installation of BMP's & erosion control measures; 4) habitat improvements (tree drops & macrophyte bed); 5) completed workshops, pamphlets & newsletters; 6) final report (w/ BMP's & nutrient run-off component).

Specific conditions: Shoreling habitat restorations require perpetual deed restrictions; final report needs Dept. review & approval.

Lake Mgt. Coor will be provided with electronic (pdf or word) & hard copy of final report & copeis of pamphlets & newsletters.


Grant Details
Lake Protection Grant
Date
10/1/2009
Waters Involved
Little St Germain Creek
Status
Complete

Little St Germain Lake P & R District: Res-Restoring Shoreline Habitat On Lt. Saint Germain Lake: Little St. Germain Lake P&R District is sponsoring a project focused on restoring 500 meters of shoreline on Lt. St. Germain Lake. Partners include the USGS, VCLA, Vilas Co. LWCD, UW Ext., WDATCP, MI Tech Univ., & WDNR.

Activities include: 1) native vegetation restoration of 500 meters of shoreline & > 4000 sq. meters of lakeshore buffer; 2) terrestrial & aquatic invasives survey & treatment/removal on restored area; 3) evaluate ecological benefits of buffer restoration for wildlife & fish pops.; 4) assess feasibility of using project to conduct experiments to quantify benifits of buffer re-establishment to reduce nutrient runoff; 5) conduct experiments to develop BMP's for shoreland restoration in the Upper Wisc. River Watershed & Northern Highlands Ecological Landscape; 6) removal, replacement of retaining walls, impervious surfaces within buffer; installation of BMPs for runoff control; 7) repair shoreland erosion w/ biologically degradable materials; 8) tree drops & aquatic macrophyte bed establishment; 9) demo. & education activities including lake ecology workshops, meetings, pamphlets & newsletters; 10) implement pollinator response surveys; 11) final report summarizing project activities including restortaion before & after photos.

Deliverables: 1) 500 meters of restoration & >4000 sq. meters of buffer area; 2) invasives control; 3) installation of BMP's & erosion control measures; 4) habitat improvements (tree drops & macrophyte bed); 5) completed workshops, pamphlets & newsletters; 6) final report (w/ BMP's & nutrient run-off component).

Specific conditions: Shoreling habitat restorations require perpetual deed restrictions; final report needs Dept. review & approval.

Lake Mgt. Coor will be provided with electronic (pdf or word) & hard copy of final report & copeis of pamphlets & newsletters.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Star Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Trout Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lower Post Lake
Status
Complete

Post Lakes P & R District: Natural Shoreland & Habitat Project: This project will implement one of the recommendations of the Post Lakes Management Plan. The project will include development of a long-term project to support and encourage shoreland buffers and restoration of shoreland properties. The project also includes the restoration of 6 lots as education demonstration sites.

Deliverables include:
1. Development of a Natural Shorelands and Habitat Committee including DNR and County representatives to guide the development of a pilot project.
2. Development of a long-term project guide including training of volunteers to complete site assessments and an education plan.
3. Site analysis and design for 6 parcels including restoration of these sites.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Manitowish Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McCabe Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McKinney Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Moon Lake
Status
Complete

Alma-Moon Lake P & R District: Res-Restoring Shoreline Habitat On Moon Lake: Alma/Moon Lake P&R District is sponsoring a project focusing on restoring 1500 feet of shoreline on Moon Lake as part of a WDNR Science Services Lakeshore Restoration Research Project. Partners include UCC Moon Beach Camp, Michigan Technical University and WDNR.

Project activities include: 1) Native vegetation restoration of 1500 feet of shoreline & >4000 square meters of lakeshore buffer area; 2) Survey of restoration area for terrestrial & aquatic invasives - all encountered will be treated &/or removed; 3) Install & maintain an 8' fence & 3' hardware cloth for 3-4 years for site protection from deer & snowshoe hares; 4) Install rain gardens along areas of significant run-off; 5) Install enviro-lock biodegradable bags along areas of significant erosion; 6) 4-6 trees will be dropped & establishment of an aquatic macrophyte bed in the restoration area; 7) Shoreline restoration demonstration & education activities including lake ecology workshops, creating pamphlets, hand-outs & video DVD's, signage, brochures, & an updated Moon Beach website detailing project progress; 8) Final report summarizing project activities, including before and after photographs of restored areas.

Project deliverables include: 1)1500 feet of restored shoreline and >4000 square meters of lakeshore buffer area; 2) Treatment &/or removal of invasive species; 3) Installed rain gardens and erosion control measures; 4) Habitat improvements (tree drops and macrophyte bed); 5) Completed workshops, pamphlets, hand-outs, video DVD's, signage, brochures, and website updates; 6) Final report.

Specific Conditionst: Shoreland habitat restorations require perpetual deed restrictions; Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, and copies of pamphlets, brochures, hand-outs, and DVD's and any established protocols for tree drops and aquatic macrophyte bed establishment.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pier Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Rest Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sherman Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Spider Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Statehouse Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 1
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 2
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 3
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stone Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sturgeon Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Tambling Lake
Status
Complete

Tambling Lake Association, Inc.: Res-Tambling Lake Aeration System: The Tambling Lake Association, Inc. will sponsor a project for the installation of one aeration system. The DNR will be provided with a written summary of the work completed under this grant and photographs.


Grant Details
Lake Protection Grant
Date
2/14/1996
Waters Involved
Torch Lake
Status
Complete

Vilas County: Acq-Torch Lake Land Acquisition - Crist Property: Vilas County will acquire 60 acres of land with frontage on Torch Lake and the Wisconsin River for lake protection and public outdoor recreation purposes. Eligible costs are outlined on the attached Cost Estimate Worksheet. PER SPONSOR: PROJECT FELL THROUGH; GRANT AWARD WITHDRAWN.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Un Spring
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Unnamed
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.

Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.

Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.

Specific conditions for this project: Annual summary and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Vance Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Aimer Creek
Status
Complete

Town Of Presque Isle: Oxbow Lake Limnological Baseline Study & Apm Plan: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Oxbow Lake in Vilas County with a study completion date of June 30, 2008. The Oxbow Lake Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi through citizen lake monitor and P, Chla, DO, and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Annabelle Lake
Status
Complete

Annabelle Lake Property Owners Assn: Annabelle Lake Prop. Owners Assn Comprehensive Lake Plan: The Annabelle Lake Property Owners Association(ALPOA) proposes to develop a comprehensive lake management plan which will address lake history, current lake issues, an inventory of physical, chemical and biological lake features, fisheries management, shoreland management, zoning, and lake management recommendations. The information will be disseminated to the public by way of newsletter mailings, entire report mailings, and a comprehensive management plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Annabelle Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change Annabelle, Lt. Crab, N. Crab, Wildcat Lake: The Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Annabelle, Little Crab, North Crab, and Wildcat Lake, in Vilas County. The Annabelle Lake Property Owners Association is a project partner. The project will focus on updating Lake Management Plans (LMP) for Annabelle, Little Crab, North Crab, and Wildcat Lake.

Project activities include: 1) Gather and assess existing Annabelle, Little Crab, North Crab, and Wildcat Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Armour Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change Armour/Big/Horsehead Lakes: Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Armour, Big and Horsehead Lake, in Vilas County. The Big Lake Property Owners Association and Friends of Armour Lake are project partners. The project will focus on updating Lake Management Plans (LMP) for Armour, Big and Horsehead Lake.

Project activities include: 1) Gather and assess existing Armour, Big and Horsehead Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Averill Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change Averill, Presque Isle, Van Vliet Lakes: Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Averill, Presque Isle and Van Vliet Lake, in Vilas County. The Presque Isle Lake Association and Van Vliet Lake Association are project partners. The project will focus on updating Lake Management Plans (LMP) for Averill, Presque Isle and Van Vliet Lake.

Project activities include: 1) Gather and assess existing Averill, Presque Isle and Van Vliet Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2013
Waters Involved
Big Lake
Status
Complete

Cisco Chain Riparian Owners Assoc: Big Lake Management Planning Project: Cisco Chain Riparian Owners Association is sponsoring a large scale lake planning grant to study Big Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Big Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (2-4), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Summarize ongoing lake management work; 3) Water quality sampling and analysis; 4) Watershed assessment and nutrient load modeling; 5) Characterize biological communities and ecosystem interactions; 6) Shoreline assessment; 7) Aquatic plant surveys (PI survey, community mapping, and substrate mapping); 8) Data analysis; 9) Volunteer watercraft inspections; 10) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI and shoreland data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) Entered inspection data into SWIMS; 8) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI survey, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Large Scale Lake Planning
Date
3/12/2021
Waters Involved
Carlin Lake
Status
Complete

Town Of Presque Isle: Carlin Lake Shoreland And Shallow Water Assessment: Project Scope and Description of Deliverables

The Town of Presque Isle is sponsoring a surface water planning grant to survey the shoreland and shallow water area of Carlin Lake, Vilas County, WI to establish a baseline condition.

Project final deliverables include: All data collected from the shoreland survey and the summary report.

Specific project activities include: 1) Shoreland and shallow water assessment; 2) Summary report

Special Conditions: 1) Draft of summary report needs Dept review and approval

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copy of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Cathaline Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Cathaline Lake: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Cathaline Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Cathaline Lake.

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Professional and volunteer AIS monitoring; 5) Educational program \2013 meetings and \201Cfloating\201D workshop; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) PI, AIS and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Crab Creek
Status
Complete

Town Of Presque Isle: Crab Lake Limnological Baseline Study & Apm Plan: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Crab Lake in Vilas County with a study completion date of June 30, 2008. The Crab Lake Property Owners Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, DO, P, and Chla through citizen lake monitor and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Crab Creek
Status
Complete

Town Of Presque Isle: Presque Isle & Little Horsehead Lake Limnological Baseline Studies & Apm Plans: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Presque Isle and Little Horsehead Lakes in Vilas County with a study completion date of June 30, 2008. The Presque Isle Lake Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan for each lake.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from each lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, DO, P, and Chla through citizen lake monitor and Temp during aquatic plant sampling for Presque Isle - secchi, DO, P, Chla, and Temp during aquatic plant sampling for Little Horsehead
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from each lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from each lake.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Crab Lake
Status
Complete

Town Of Presque Isle: Crab Lake Limnological Baseline Study & Apm Plan: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Crab Lake in Vilas County with a study completion date of June 30, 2008. The Crab Lake Property Owners Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, DO, P, and Chla through citizen lake monitor and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Crab Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change For Crab Lake: The Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Crab Lake, in Vilas County. Crab Lake Property Owners Association is a project partner. The project will focus on updating a Lake Management Plan (LMP) for Crab Lake.

Project activities include: 1) Gather and assess existing Crab Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Crab Lake
Status
Proposed

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change For Crab Lake: The Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Crab Lake, in Vilas County. Crab Lake Property Owners Association is a project partner. The project will focus on updating a Lake Management Plan (LMP) for Crab Lake.

Project activities include: 1) Gather and assess existing Crab Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Horsehead Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change Armour/Big/Horsehead Lakes: Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Armour, Big and Horsehead Lake, in Vilas County. The Big Lake Property Owners Association and Friends of Armour Lake are project partners. The project will focus on updating Lake Management Plans (LMP) for Armour, Big and Horsehead Lake.

Project activities include: 1) Gather and assess existing Armour, Big and Horsehead Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Junction Creek
Status
Complete

Annabelle Lake Property Owners Assn: Annabelle Lake Prop. Owners Assn Comprehensive Lake Plan: The Annabelle Lake Property Owners Association(ALPOA) proposes to develop a comprehensive lake management plan which will address lake history, current lake issues, an inventory of physical, chemical and biological lake features, fisheries management, shoreland management, zoning, and lake management recommendations. The information will be disseminated to the public by way of newsletter mailings, entire report mailings, and a comprehensive management plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Little Crab Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change Annabelle, Lt. Crab, N. Crab, Wildcat Lake: The Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Annabelle, Little Crab, North Crab, and Wildcat Lake, in Vilas County. The Annabelle Lake Property Owners Association is a project partner. The project will focus on updating Lake Management Plans (LMP) for Annabelle, Little Crab, North Crab, and Wildcat Lake.

Project activities include: 1) Gather and assess existing Annabelle, Little Crab, North Crab, and Wildcat Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Little Horsehead Lake
Status
Complete

Town Of Presque Isle: Presque Isle & Little Horsehead Lake Limnological Baseline Studies & Apm Plans: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Presque Isle and Little Horsehead Lakes in Vilas County with a study completion date of June 30, 2008. The Presque Isle Lake Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan for each lake.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from each lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, DO, P, and Chla through citizen lake monitor and Temp during aquatic plant sampling for Presque Isle - secchi, DO, P, Chla, and Temp during aquatic plant sampling for Little Horsehead
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from each lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from each lake.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Lynx Creek
Status
Complete

Town Of Presque Isle: Crab Lake Limnological Baseline Study & Apm Plan: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Crab Lake in Vilas County with a study completion date of June 30, 2008. The Crab Lake Property Owners Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, DO, P, and Chla through citizen lake monitor and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Lynx Creek
Status
Complete

Town Of Presque Isle: Oxbow Lake Limnological Baseline Study & Apm Plan: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Oxbow Lake in Vilas County with a study completion date of June 30, 2008. The Oxbow Lake Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi through citizen lake monitor and P, Chla, DO, and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Lynx Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Lynx Lake: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Lynx Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Lynx Lake.

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Professional and volunteer AIS monitoring; 5) Educational program \2013 meetings and \201Cfloating\201D workshop; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) PI, AIS and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Lynx Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Lynx Lake: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Lynx Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Lynx Lake.

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Professional and volunteer AIS monitoring; 5) Educational program \2013 meetings and \201Cfloating\201D workshop; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) PI, AIS and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2013
Waters Involved
Mamie Lake
Status
Complete

Cisco Chain Riparian Owners Assoc: Cisco Chain Of Lakes Management Planning Project - Mamie Lake: Cisco Chain Riparian Owners Association is sponsoring a large scale lake planning grant to study Mamie Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Mamie Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (2-4), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Summarize ongoing lake management work; 3) Water quality sampling and analysis; 4) Watershed assessment and nutrient load modeling; 5) Characterize biological communities and ecosystem interactions; 6) Shoreline assessment; 7) Aquatic plant surveys (PI survey, community mapping, and substrate mapping); 8) Data analysis; 9) Volunteer watercraft inspections; 10) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI and shoreland data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) Entered inspection data into SWIMS; 8) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI survey, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
North Crab Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change Annabelle, Lt. Crab, N. Crab, Wildcat Lake: The Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Annabelle, Little Crab, North Crab, and Wildcat Lake, in Vilas County. The Annabelle Lake Property Owners Association is a project partner. The project will focus on updating Lake Management Plans (LMP) for Annabelle, Little Crab, North Crab, and Wildcat Lake.

Project activities include: 1) Gather and assess existing Annabelle, Little Crab, North Crab, and Wildcat Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Oxbow Lake
Status
Complete

Town Of Presque Isle: Oxbow Lake Limnological Baseline Study & Apm Plan: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Oxbow Lake in Vilas County with a study completion date of June 30, 2008. The Oxbow Lake Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi through citizen lake monitor and P, Chla, DO, and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Oxbow Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Changefor Oxbow Lake: The Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Oxbow Lake. The Oxbow Lake Association is a project partner. The project will focus on updating a Lake Management Plan (LMP) for Oxbow Lake.

Project activities include: 1) Gather and assess existing Oxbow Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Oxbow Lake
Status
Proposed

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Changefor Oxbow Lake: The Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Oxbow Lake. The Oxbow Lake Association is a project partner. The project will focus on updating a Lake Management Plan (LMP) for Oxbow Lake.

Project activities include: 1) Gather and assess existing Oxbow Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Oxbow Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Oxbow Lake: The Town of Presque Isle is sponsoring a Lake Planning grant to study Oxbow Lake, in Vilas County. The project will focus on updating an existing Lake Management Plan (LMP).

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Water quality assessment; 5) Professional and volunteer AIS monitoring; 6) Educational program \2013 meetings and \201Cfloating\201D workshop; 7) Watercraft inspections; 8) Update LMP.

Project deliverables include: 1) PI, AIS water quality, and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Presque Isle: Presque Isle & Little Horsehead Lake Limnological Baseline Studies & Apm Plans: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Presque Isle and Little Horsehead Lakes in Vilas County with a study completion date of June 30, 2008. The Presque Isle Lake Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan for each lake.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from each lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, DO, P, and Chla through citizen lake monitor and Temp during aquatic plant sampling for Presque Isle - secchi, DO, P, Chla, and Temp during aquatic plant sampling for Little Horsehead
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from each lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from each lake.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change Averill, Presque Isle, Van Vliet Lakes: Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Averill, Presque Isle and Van Vliet Lake, in Vilas County. The Presque Isle Lake Association and Van Vliet Lake Association are project partners. The project will focus on updating Lake Management Plans (LMP) for Averill, Presque Isle and Van Vliet Lake.

Project activities include: 1) Gather and assess existing Averill, Presque Isle and Van Vliet Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: South Branch Presque Isle River: The Town of Presque Isle is sponsoring a large scale lake planning grant to study the South Branch of the Presque Isle River, in Vilas County.

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Professional and volunteer AIS monitoring; 5) Educational program \2013 meetings and \201Cfloating\201D workshop; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) PI, AIS and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
South Branch Presque Isle River
Status
Complete

Town Of Presque Isle: Presque Isle & Little Horsehead Lake Limnological Baseline Studies & Apm Plans: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Presque Isle and Little Horsehead Lakes in Vilas County with a study completion date of June 30, 2008. The Presque Isle Lake Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan for each lake.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from each lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, DO, P, and Chla through citizen lake monitor and Temp during aquatic plant sampling for Presque Isle - secchi, DO, P, Chla, and Temp during aquatic plant sampling for Little Horsehead
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from each lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from each lake.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
South Branch Presque Isle River
Status
Complete

Town Of Presque Isle: Wilderness Waters: South Branch Presque Isle River: The Town of Presque Isle is sponsoring a large scale lake planning grant to study the South Branch of the Presque Isle River, in Vilas County.

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Professional and volunteer AIS monitoring; 5) Educational program \2013 meetings and \201Cfloating\201D workshop; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) PI, AIS and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Unnamed
Status
Complete

Town Of Presque Isle: Crab Lake Limnological Baseline Study & Apm Plan: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Crab Lake in Vilas County with a study completion date of June 30, 2008. The Crab Lake Property Owners Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, DO, P, and Chla through citizen lake monitor and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Unnamed
Status
Complete

Town Of Presque Isle: Oxbow Lake Limnological Baseline Study & Apm Plan: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Oxbow Lake in Vilas County with a study completion date of June 30, 2008. The Oxbow Lake Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi through citizen lake monitor and P, Chla, DO, and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Van Vliet Lake
Status
Complete

Van Vliet Lake Association: Van Vliet Lake Comprehensive Plan: The Van Vliet Lake Association Inc., will sponsor this project which will complete a comprehensive lake plan for Van Vliet Lake. The plan will focus on an APM plan, Fish Management Plan and Water Quality Plan. Additional areas that will be addressed will be lake history, a shoreline survey and extensive information and education. The project scope and methods must be pre-approved by the Department prior to any work beginning.

All final reports will provided to the Department with raw and summarized data in both hard copy and electronic format.

*Items have been removed from the original proposal, please refer to letters from Jennifer Wudi regarding eligible items and revised proposal.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Van Vliet Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change Averill, Presque Isle, Van Vliet Lakes: Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Averill, Presque Isle and Van Vliet Lake, in Vilas County. The Presque Isle Lake Association and Van Vliet Lake Association are project partners. The project will focus on updating Lake Management Plans (LMP) for Averill, Presque Isle and Van Vliet Lake.

Project activities include: 1) Gather and assess existing Averill, Presque Isle and Van Vliet Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2013
Waters Involved
Van Vliet Lake
Status
Complete

Van Vliet Lake Association: Van Vliet Lake Shoreland & Aquatic Plant Study: Van Vliet Lake Association is sponsoring a large scale lake planning grant to study Van Vliet Lake, in Vilas County. The project will focus on updating a Lake Management Plan (LMP) for Van Vliet Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey and planning meetings; 2) Shoreland assessment; 3) Aquatic plant community mapping and acoustic mapping; 4) Develop aquatic plant monitoring and management strategy; 5) Update LMP.

Project deliverables include: 1) Stakeholder survey; 2) Aquatic plant, acoustic and shoreland data; 3) Aquatic plant community maps; 4) Updated LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to the public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, stakeholder survey, data from shoreland assessment, aquatic plant community survey and acoustic mapping survey, all maps and all GIS data from the project.


Grant Details
Large Scale Lake Planning
Date
4/1/2013
Waters Involved
Van Vliet Lake
Status
Proposed

Van Vliet Lake Association: Van Vliet Lake Shoreland & Aquatic Plant Study: Van Vliet Lake Association is sponsoring a large scale lake planning grant to study Van Vliet Lake, in Vilas County. The project will focus on updating a Lake Management Plan (LMP) for Van Vliet Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey and planning meetings; 2) Shoreland assessment; 3) Aquatic plant community mapping and acoustic mapping; 4) Develop aquatic plant monitoring and management strategy; 5) Update LMP.

Project deliverables include: 1) Stakeholder survey; 2) Aquatic plant, acoustic and shoreland data; 3) Aquatic plant community maps; 4) Updated LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to the public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, stakeholder survey, data from shoreland assessment, aquatic plant community survey and acoustic mapping survey, all maps and all GIS data from the project.


Grant Details
Small Scale Lake Planning
Date
10/1/2004
Waters Involved
Van Vliet Lake
Status
Complete

Van Vliet Lake Association: Van Vliet Lake Managment Small Planning Grant - Do Meter: The Van Vliet Lake Association, Inc. will sponosor a project to purchase a Dissolved Oxygen (D.O.) meter and conduct D.O. monitoring on Van Vliet Lake. It has been recently determined, from on-going water quality sampling, that D.O. data should be collected in Van Vliet Lake as the lake is relatively shallow and vulnerable to winterkill and periodic summertime oxygen depletion and subsequent re-mixture. A meter will result in a reduction of time spent by VVLA members for measurements from titration method used now 1.5 hours down to minutes. This will allow for monthly and more frequent measurements. It will be used year-round. Results will be documented and entered into the DNR lakes database. A consultant will be available for education, training and help with analysis of the results.

Products: 1. Purchase of a D.O. Meter under $1000 for the unit. 2. Purchase of accessories, membrane kits and maintenance supplies. 3. Get training and calibrations help from consultant.
4. Conduct verification sampling, as needed, with titration method to confirm that its operating correctly. 5. Enter the data in the DNR Lakes Database with the Self-Help Lake monitoring data.

A final report including information on cost, contact person, problems and project results will be submitted to the Department in written and electronic form.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Presque Isle River Watershed
Watershed Recommendations
Aquatic Plant Monitoring or Survey
 
Date
Status
4/1/2013
Proposed
Projects
 
Aquatic Plant Monitoring or Survey
 
Date
Status
10/1/2012
Proposed
Projects
 
Aquatic Plant Monitoring or Survey
 
Date
Status
10/1/2012
Proposed
Projects
 
Develop/Distribute Brochures/Literature
 
Date
Status
10/1/2012
Proposed
Projects
 
Develop/Distribute Brochures/Literature
 
Date
Status
10/1/2012
Proposed
Projects
 
Information and Education
 
Date
Status
4/1/2013
Proposed
Projects
 
Information and Education
 
Date
Status
10/1/2012
Proposed
Projects
 
Information and Education
 
Date
Status
10/1/2012
Proposed
Projects
 
Informational Meetings
 
Date
Status
4/1/2013
Proposed
Projects
 
Informational Meetings
 
Date
Status
10/1/2012
Proposed
Projects
 
Informational Meetings
 
Date
Status
10/1/2012
Proposed
Projects
 
Lake Management Plan Development
 
Date
Status
update
4/1/2013
Proposed
Projects
 
Lake Management Plan Development
 
Date
Status
10/1/2012
Proposed
Projects
 
Lake Management Plan Development
 
Date
Status
10/1/2012
Proposed
Projects
 
Lakes Planning Grant
 
Date
Status
4/1/2013
Proposed
Projects
 
Lakes Planning Grant
 
Date
Status
10/1/2012
Proposed
Projects
 
Lakes Planning Grant
 
Date
Status
10/1/2012
Proposed
Projects
 
Map Invasive Species
 
Date
Status
4/1/2013
Proposed
Projects
 
Map Invasive Species
 
Date
Status
10/1/2012
Proposed
Projects
 
Map Invasive Species
 
Date
Status
10/1/2012
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
11/8/2011
Proposed
Projects
 
Monitor Invasive Species
 
Date
Status
10/1/2012
Proposed
Projects
 
Monitor Invasive Species
 
Date
Status
10/1/2012
Proposed
Projects
 
Monitor Water Level
Annebelle Lake Water Level
Date
Status
Wisconsin Department of Natural Resources and the University of Wisconsin-Extension have developed a citizen-based, statewide lake-level monitoring effort.
1/1/2010
In Progress
Projects
 
Monitor or Assess Watershed Condition
 
Date
Status
10/1/2012
Proposed
Projects
 
Monitor or Assess Watershed Condition
 
Date
Status
10/1/2012
Proposed
Projects
 
Shoreland Monitoring, Assessment, Inventory
Grant LPL-1530-13 - Shoreland Assessment
Date
Status
Shoreland Monitoring, Assessment or Inventory
4/1/2013
Proposed
Projects
 
Social Survey of Residents or Users
 
Date
Status
4/1/2013
Proposed
Projects
 
Watershed Mapping or Assessment
 
Date
Status
4/1/2013
Proposed
Projects
 
Presque Isle River WatershedWatershed History Note

The Presque Isle River Watershed, located in Vilas County, is full of hundreds of lakes, summer cottages, fishing camps and resorts. One of the oldest resorts is Ben's Camp, located along Mamie Lake, one of the Cisco Chain of Lakes. Bent's Camp was established in 1896 for sport fishing and hunting by Charles Bent. The Lodge restaurant was built in 1906, and the original birch bark and cedar strip walls and ceiling can still be viewed in the bar area.

Date  2010